Laserfiche WebLink
, <br /> AT&Tjob #6324057 REL#4 <br /> San Joaquin County Encroachment Permit Application <br /> Description of Work <br /> AT&T to place approx. 80' of 1 -4" CPC by trenching in dirt at three <br /> locations in County right-of-way on the east side and west side of <br /> Highway 99 W Frontage Rd. between Mariposa Rd. and Loomis Rd. <br /> AT&T to place overhead cable on existing poles on the east and <br /> west sides of Highway 99 W Frontage Rd. between Mariposa Rd. and <br /> Carpenter Rd. <br /> AT&T to place overhead cable on existing poles on the east side of <br /> Highway 99 E Frontage Rd. between Mariposa Rd. and Marfargoa Rd. <br /> AT&T to place overhead cable on existing poles on the north side of <br /> Mariposa Rd. between Highway 99 and Munford Ave., and on the <br /> south side of Mariposa Rd. between Munford Ave. and Carpenter Rd. <br /> AT&T to place 1 new pole on the south side of Mariposa Rd. <br /> between Highway 99 and Munford Ave. <br /> AT&T to place overhead cable on existing poles on the north side of <br /> Munford Ave. between Mariposa Rd. and Highway 99. <br /> AT&T to remove overhead cable and poles on the west side of the <br /> RHi hway 99 W Frontage Rd. between Mariposa Rd. and Carpenter <br /> AT&T to remove overhead cable and poles on the east side of <br /> Highway 99 E Frontage Rd. between Mariposa Rd. and Munford Ave. <br /> AT&T to remove overhead cable and poles on the south side of <br /> Mariposa Rd. between Highway 99 and approximately 600' s/o <br /> Munford Ave. <br /> AT&T to remove overhead cable and poles on the north side of <br /> Munford Ave. between Mariposa Rd. and Highway 99. <br /> Most work should only require a shoulder closure. The attached <br /> TCP covers both a shoulder closure and a lane closure, should one <br /> be necessary. <br />