My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1402501 thru PS-1403000_ - PS-1402724
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2014
>
PS-1402501 thru PS-1403000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1402501 thru PS-1403000_ - PS-1402724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:28:53 PM
Creation date
12/31/2015 1:25:52 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1402724
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2014\PS-1402501 thru PS-1403000
Year2
2014
Supplemental fields
Applicant
HALEY CONTRACTING
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
VARIOUS COUNTY ROADS WITHIN THE EASTSIDE RURAL
Primary Parcel
Type (2)
PS-1402724
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for <br /> Fire Hydrant Repairs/Replacements -2- <br /> ENCROACHMENT PERMIT <br /> 14. Trenches/bell holes shall be maintained in a smooth and even condition to the satisfaction of the <br /> County throughout the project limits at all times. <br /> 15. All trenches/bell holes shall be completely backfilled or shored and plated at the end of each <br /> workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br /> and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br /> submitted for prior approval by the County. <br /> 16. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches and/or bell <br /> holes within the County right-of-way. Where the existing road structural section is below <br /> standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate base <br /> shall be required. <br /> 17. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 18. Roadway areas subject to pavement cuts shall receive a one (1) inch asphalt concrete overlay <br /> from the centerline (or lane line) to the edge of the travelled way. If the pavement is disturbed on <br /> both sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10-working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 19. No paving joints allowed within paved shoulder, contractor shall pave all the way to outer edge of <br /> paved shoulder. <br /> 20. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 21. Shoulder backing shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 4-foot wide. <br /> 22. School buses shall be passed through the work zone with minimal delays. <br /> 23. County roads shall be kept clean from mud and debris and ponding water at all times along the <br /> access points and work zone areas during entire project. All standard roadway striping and <br /> signage shall be clearly visible, maintained and restored throughout the construction zone during <br /> and after the project. <br /> 24. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris and ponding water during construction activities. The contractor shall <br /> provide daily, or as needed, street sweeping using a modern mechanical or vacuum-assisted <br /> street sweeper. <br />
The URL can be used to link to this page
Your browser does not support the video tag.