Laserfiche WebLink
Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnishfull-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can-be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMLN'T: Dirt and mud shall not be deposited on the pavement <br /> outside tl-re area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAIELY:RESTORATTON: Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER-TIGHT'CONDITION: Alf trenches shall be fif(ed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />