Laserfiche WebLink
NOTES.. . . <br /> EXHIBIT 2 <br /> 9. If the dista,ce between cross—cuts -are lessShen IST the -entire area <br /> between' cross—cuts shall be planed and resurfaced with inch of <br /> Asphalt Concrete. <br /> 2. The resurfacing requirements shall .be in addition to Counter Standard <br /> Drawing No. R-29. <br /> 3. - Resurfacing for Bell Holes shall meet these requirements. if eycavation occurs <br /> within the shoulder or lane, ortly that area shall be resurfaced as shorn. <br /> 4. If cross—cutting is performed on Local Roods at intervals less then ISO" a <br /> Seal Coat for that half of the roadway containing the trench can �a used in <br /> Iieu of resurfacing. Section 3910,3 (8-2). <br /> • r <br /> n ty <br /> �f <br /> O�U <br /> >-C - <br /> O <br /> Paved Shoulder---i X m Q <br /> U`T- <br /> i ��� O <br /> EL f r � <br /> SJJ I I Q � U <br /> I <br /> jLLI <br /> I <br /> T - <br /> y LD <br /> f <br /> JEo <br /> COUNN ROADWAYS <br /> cls °sem t '^'iG � <br /> .- <br /> Lr, TS.A <br /> Y OF N JOAQ UL-7V <br /> E _ _ Dia- sr or p-U3iac Wo_�s f <br /> Drmn br-—1mo 10'1 kvd 47 <br />