Laserfiche WebLink
- - -- -------S-P-E-CTA L--P R O VrS-IO N-S-- -- -- - . - -- --- -- - <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of a[[ work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company-representative has made an evaluation of weather conditions and has <br /> determined the work can be accompi!shad under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the paverimeht <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY:RESTOP,ATION: Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEA.THER�TIGHT•CON ITION: Ail trenches shall be fffed and bompacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />