Laserfiche WebLink
------------ ------�-P--ECTAL--P R O Vr�fO ISS-- -------:_--- -:- , ----------- - -• <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit pt'ovislons. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company,representative has made an evaluation of weather conditions and has <br /> determined the work can-be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEN ENT: :Dirt and mud shall not be deposited on the pavement <br /> outside th'e area of work, and if!hadvertentfy tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY.RESTORATION:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER;i=-H 'CONDITION: Ail trenches shall be filled and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />