My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1402501 thru PS-1403000_ - PS-1402849
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2014
>
PS-1402501 thru PS-1403000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1402501 thru PS-1403000_ - PS-1402849
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:29:21 PM
Creation date
12/31/2015 1:28:18 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1402849
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2014\PS-1402501 thru PS-1403000
Year2
2014
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - SAN RAMON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
N/S W RIPON RD 1,200' E/O UNION RD
Primary Parcel
Type (2)
PS-1402849
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- - -- ..: <br /> ------ "P F-CT-L--P R 4 VrSr01�1^S - -- -- - - -- --- --- -. <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shaft furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMZNT: Dirt and mud shall not'be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DA�Y:REST0kATI6N:• Private driveways and road intersections shalt be restored <br /> daily <br /> 5. WEATHER-'TXGET'CONDTTION: Ail trenches shall be fdfed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.