Laserfiche WebLink
Doc a: 2014-135278 <br /> 12/31/2014 01:17:07 PM <br /> Page: i of 6 Fee: $29.00 <br /> Kenneth W Blakemore <br /> San Joaquin County Recorders <br /> Paid By: COUNTY ON DOCUMENT <br /> After recording, return to: ', VV I <br /> County of San Joaquin IIII F[IN&ON1yIy'I III <br /> c/o Director of Public Works <br /> 1810 E. Hazelton Avenue <br /> Stockton, California 95205 <br /> Attention: Public Services Division <br /> Space above this line for Recorder's use <br /> ROAD AND PIPELINE MAINTENANCE AGREEMENT <br /> This Road Maintenance Agreement(the "Obligation")is signed this 1 day <br /> of acem6tr ,2014 by TAP Land Company, LP, a California Limited Partnership(hereinafter <br /> referred to as "Obligors"). <br /> WHEREAS,the Obligors are owners of APN 245-140-10 (hereinafter referred to as "the <br /> Land")and have made an application for an encroachment permit with the San Joaquin County <br /> Department of Public Works(hereinafter referred to as"County") for the installation of a <br /> private pipeline under a section of County owned road known as Wagner Road(hereinafter <br /> referred to as"Road", as defined below); and, <br /> WHEREAS,this Obligation for repair and maintenance is a required condition for the <br /> approval of Encroachment Permit No. PS-1402870 with San Joaquin County for the installation <br /> of a private eight inch irrigation pipeline (hereinafter referred to as"Pipeline"). <br /> Now,therefore, in consideration of the above,the Obligor hereto agrees as follows: <br /> 1. Description and Definition of"Road" and"Pipeline" Road is the section of road <br /> situated between APN 245-140-10 and APN 245-130-25 starting at the intersection of the <br /> Pipeline and the west side road right-of-way and continuing easterly parallel to the alignment of <br /> the Pipeline for a distance of seven and a half feet to each side of the pipeline measured <br /> perpendicularly from the centerline of the pipeline alignment(a total of fifteen feet). Pipeline is a <br /> private 8"pipeline. Both the Road and Pipeline are shown on the attached Exhibit"A"and <br /> incorporated herein by this reference. <br /> 2. Obligation. This Obligation for repair and maintenance is a required condition for <br /> the approval of Encroachment Permit No. PS-1402870 with San Joaquin County for the <br /> installation of the Pipeline and as consideration for such, Obligors shall be responsible for the <br /> maintenance of Pipeline and Road, including but not limited to the grading and resurfacing of the <br /> Road resulting from installation of Pipeline and/or related to the maintenance of Pipeline. <br /> Obligor shall obtain an encroachment permit prior to and for all work within road right-of-way. <br /> 3. Maintenance Standard. The minimum improvement standard(s)shall be as <br /> 1 <br />