Laserfiche WebLink
i <br /> VrSro N-S.- - --_ <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> r of all work to ir-.sure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLtAN PAVEWNT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if lhadverteritly tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAJL-Y RESTQItATION­Private driveways and road interseotions shall be restored <br /> daily <br /> 5. WEA.THER:'TGHT'cQNDITION: All trenches shall be fdfed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any, rain. <br />