Laserfiche WebLink
- - -- -------S-P"E-CTAL--P R 4 VfS-I 01-S - -- -- -- -- - <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish.full-time supervision <br /> of al[ work to insure full compliance with the permit provisions. <br /> 2. STAN OF WORK: No work wfthin the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if[nadverten'i[y tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY:RESTOPtATION:- Private driveways and road intersections shalt be restored <br /> daily <br /> S. WEATHER-TIGRT'CONDITION: AI trenches shall be filled and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />