Laserfiche WebLink
oyrS-ro I_s-- - -- --- - -- -- <br /> Winter Weather Utility Work <br /> 1. SUPERVLSFON: The utility company(permittee) shall famish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START Off'WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can die accomplished under the provisions of the permit. <br /> 3. CLEAN PA EENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if ihadverten-dy tracked onto the road travel way shall <br /> be removed.immediately. <br /> 4. DA.ILY:RESTOPATION: Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEA.-THERQTI.GRICON ATION: All trenches shall be flied andbompacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> i <br />