Laserfiche WebLink
PS-1402988 October 24. 2014_ <br /> SPECIAL CONDITIONS FOR <br /> WOODSBRO ROAD PIPE REPLACEMENT <br /> ENCROACHMENT PERMIT <br /> 1. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access.. <br /> 2. Existing fences shall not be removed without written consent signed by the property owner and <br /> submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br /> better materials at the edge of the right-of-way. <br /> 3. No trench cutting of County roads shall occur between November 1 and March 31 without prior <br /> authorization by the County. <br /> 4. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31, unless authorized by the County. <br /> 5. All pavement markings destroyed or obliterated must be replaced in kind by the permittee. Typical <br /> pavement markings include, but not limited to, lane lines, centerlines, stop and stop ahead <br /> legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 6. The permittee is responsible for any Survey Monuments disturbed by this project and shall file a <br /> corner record to reestablish them using a Licensed Land Surveyor. <br /> 7. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by Woods Irrigation Co. Woods Irrigation Co. shall be <br /> responsible for any and all costs associated with the removal, relocation and/or adjustment of <br /> these facilities as determined by the County at Woods Irrigation Co.'s expense. (Streets and <br /> Highways Code 1463) <br /> 8. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 9. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 10. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 11. Roadway areas subject to pavement cuts shall receive a one (1) inch asphalt concrete overlay <br /> from the centerline (or lane line) to the edge of the travelled way. If the pavement is disturbed on <br /> both sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10-working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br />