Laserfiche WebLink
i <br /> V EST 0 N-S <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(psrmittee) shall furnish.full-time supervision <br /> r of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> 3. CLVANPAVEWNT: Dirt and mud shall not,be deposited on the pavement <br /> outside the area of work, and if inadvat tentty tracked onto tfie road travel way shall <br /> be removed immediately. <br /> 4. DAM Y,RESTOP.A.TION:" -Private driveways and road intersections shalt be restored <br /> daily <br /> 5. WEA THER�TIgHT'QONDITIQN: A( trenches shall be fifed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />