Laserfiche WebLink
Winter Weatiieir Utility Work <br /> 1. SUPERVISION., The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions, <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of.ti-ie permit. <br /> 3, CLEAN PAVE1t ENT: Dirt and mud shall not*be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY RRSTOP-iT16N:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATBER-;TI.GHT'EONDITION: Ail trenches shall be filled and'compacted, <br /> ditches an othdr drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />