Laserfiche WebLink
Winter Weather Utility'Fork <br /> 1. SUPhRVfSI.ON: The utility company(permittee) shall fumish.full-time supervision <br /> r of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can-be accomplished under the provisions of.tHe permit. <br /> 3. CLVAN PAVEWNT: Dirt and mud shall not'be deposited on the pavement <br /> outside th'e area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY RESTORATION:• Private driveways and road intersections shall be restored <br /> daily <br /> 5. WTATHER-41MT'OQNDITION: Ail trenches shall be fif[ed andbompacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> 1 <br />