Laserfiche WebLink
UN - - --- - -- - - <br /> Winter Weather Unity Work <br /> 1: SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of al[ work to insure full compliance with the permit provisions. <br /> 2. START OR WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can.be accomplished under the provisions of.tiie permit. <br /> 3. CIIRANPA.'VEWNT: Dirt and mud shalt not-b6 deposited on the pavement <br /> outside the area of work, and if ihadvertently tracked onto the road travel-way shall <br /> be removed immediately=. <br /> 4. DAIX:RESTO.P,AI1ON: Private dr(veways and road interseotions shall be restored <br /> daily <br /> 5. WEATBER-TI.GHT•OONDITION: Ail trenches shall be filed andbompacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-fight condition prior to any rain. <br /> • R <br /> •.tel <br /> t <br />