My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2602517
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2026
>
PW-ENCUTIL-2602501 thru PW-ENCUTIL-2603000
>
PW-ENCUTIL-2602517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2026 4:35:44 PM
Creation date
8/26/2026 10:31:13 AM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2602517
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2026
Location
2013 E 7TH ST STOCKTON
Type - Permit Process
Overlash approx. 491'± of fiber along existing poles, bore approx. 85'± to place (2) 2" conduit and 1 new power supply, and perform splicing at 12 existing locations for Comcast services.
Address
12687 S MANTHEY RD Lathrop, CA 95330
Application
Mastec Nother America Inc
Project #
110005
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6" Min 6'--w- <br />(Typ) <br />3'-0" <br />Var V� � <br />OD/2 <br />10" Min <br />+ 20" Min <br />RIGID CONDUIT <br />NOTES: <br />See Note 1 Below <br />Existing - <br />Pavement <br />See Note <br />2 Below <br />-Compact in <br />12" max <br />layers to a <br />min relative ; <br />compaction <br />of 95% <br />under pavement and <br />90% outside <br />pavement. <br />y\ <br />-Compact in <br />24" max , <br />layers to a min relative <br />compaction <br />of 85%. <br />-Compact in <br />6" layers <br />to a min relative <br />compaction <br />of 90%. <br />10" Min 10" Min ---w <br />--*-6" [--"--6" Min <br />(Typ) <br />VA <br />3'-0" <br />--- i <br />� Var <br />OD <br />+ 20" Min <br />FLEXIBLE CONDUIT <br />OD+ 12" <br />10" Min <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1 " thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Working for YOU <br />TYPICAL TRENCH BACKFILL /y Av� <br />No. Revision Description Date <br />COUNTY OF S'AN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.