Laserfiche WebLink
Winter Weather Utility Work <br /> i s SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2, START OF WORF- No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of.tlie permit. <br /> 3. OIIEANPA't EWNT: Dirt and mud shall not,be deposited on the pavement <br /> outside the area of work, and if inadverterrtdy tracked onto the road travel way Shall <br /> be removed immediately. <br /> 4. DA LY.RESTO:P,:AT16N:- -Private driveways and road intersections shalt be restored <br /> daily <br /> S. VVEA:THEMMI T'CONMION: All trenches shall be f.[ffed and'compacted, <br /> ditches an other drainage-facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />