Laserfiche WebLink
Always indicate specific section on sketch if multiple values for material, method of installation, size, or year installed (if year is available) are applicable to a single service. <br />Not intended to be inclusive of all possible symbols. <br />This section is for reference only. <br />Gas Line (New) ® Meter Anode <br />Gas Line (Existing) ® Meter Manifold ® Electronic Marker <br />Main <br />. Material <br />Service pipe <br />Method of install per <br />Service tee <br />o TD-4461M: Trench, HDD, <br />Pressure classification: High pressure (HP), <br />splitting, dry bore, insert <br />semi —high pressure (SHP ), low pressure <br />* Pipe size <br />LP , transmission pressure TP <br />�', <br />* Status: New or existing <br />* Existing pipe: Year install <br />Mother/branch service <br />New cathodic protection (e.g. anode) <br />v <br />if available <br />Abandoned pipe <br />Electronic markers <br />a <br />71denaterial <br />zeFittings <br />per TD-4461M <br />ch (JT) <br />Curb valve <br />Excess flow valve <br />Meter/manifold <br />Pipe casing <br />Regulating stations Involved in or within <br />close proximity to work <br />Meter guards <br />Method of joint connection per <br />TD-950OP-14—JAOI <br />LAN ID* of qualified individual performing <br />connection <br />PG&E lnbe l <br />ripe size <br />Material <br />Type: Main or service <br />Status: New ar existing <br />System status: Tied (T) or <br />dead end (DE) <br />Existing pipe: year installed <br />if available <br />Casing material <br />Casing size <br />* Joint trench NT) <br />Reducer <br />OR EFV —& Valve with Frame and Cover <br />'T <br />r Service Tee <br />—D OR Cap Pipe Size and Material (Casing Size and Material) Insert <br />Name of nearest cross street <br />as ruc ions for Abandonments: <br />Name of street <br />The following is the minimum information required <br />North arrow <br />when documenting abandonments on the GSR. <br />Street address <br />Dimension service tee to service end <br />Dimension service tee to nearest cross street <br />Casing length <br />Abandoned pipe length <br />Width of cross street <br />Repairs: Dimension from service tee or riser <br />and length of repair <br />Partial replacement: Dimension from service lec <br />or riser and length of installation <br />Stub completion: Dimension from service tee of <br />beer and length of installation <br />Manifold or large meter. Dimension minimum <br />distance required between structure and riser <br />Lateral offset: Dimension from service tee or <br />riser <br />Valves and fittings: Dimension from service tee <br />or riser <br />Location of gas flow termination <br />Installed assets related to abandonment (e.g. <br />electronic markers, end caps, plugs) <br />Abandoned pipe: Length, material, size <br />Abandoned pipe: Year Installed, if available <br />Date abandonment work was completed in <br />accordance with TD-950OP-16 <br />LAN ID and signature* or printed name of the <br />qualified field representative performing <br />required test(s) and/or inspection(s) <br />LAN ID and signature or printed name* of the <br />person in charge responsible for installing <br />assets and performing work related to <br />abandonment <br />Excavation Agent: PG&E or Applicant <br />Abandonment order reference <br />* Abandoned non —pipe assets, if <br />available: material, size. <br />