My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2602466
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2026
>
PW-ENCUTIL-2602001 thru PW-ENCUTIL-2602500
>
PW-ENCUTIL-2602466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2026 2:24:46 PM
Creation date
8/26/2026 2:17:34 PM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2602466
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2026
Location
2459 Wandman Ave.
Type - Permit Process
This project proposes to overpull approx. 27' from county limit to exist. pole #1. Locate and intercept exist. duct to set wye cast via placing bore pit #1. Hand trench approx 5' to place 2-2" conduit & cable from bore pit #1 to county right-of-way line on Waudman Ave.
Application
Congruex
Project #
110005
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6" Min 6'm <br />(TYP) <br />3'-0" <br />Var <br />1 -i� <br />OD/2 <br />10" Min <br />+ 20" Min <br />RIGID CONDUIT <br />NOTES: <br />See Note 1 Below <br />Existing <br />Pavement <br />See Note 2 Below <br />Compact in 12" max — <br />layers to a min relative <br />compaction of 95% <br />under pavement and <br />90% outside pavement. <br />-Compact in 24" max --// <br />layers to a min relative <br />compaction of 85%. <br />Compact in 6" layers <br />to a min relative <br />compaction of 90%. <br />u-10" Min 10" Min <br />6" �6" Min <br />(TYP) <br />OD <br />+ 20" Min <br />FLEXIBLE CONDUIT <br />3'-0" <br />Var <br />OD+ 12" <br />10" Min <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1 " thicker than existing base, min of 0.50 Ft. <br />2. Select native material or imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3. Relative compaction of materials shall be tested in accordance with <br />the State of California, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231. <br />4. All existing pavement shall be neatly cut to line prior to trench excavation. <br />5. Jetting or ponding will be permitted within the street right—of—way with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compactability, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works. <br />7. Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Working for YOU <br />TYPICAL TRENCH BACKFILL 9v� <br />No. Revision Description Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date: DEC 2014 Std. Dwg. No. R-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.