My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PW-ENCUTIL-2603223
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2026
>
PW-ENCUTIL-2603001 thru PW-ENCUTIL-2603500
>
PW-ENCUTIL-2603223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2026 9:55:25 AM
Creation date
8/31/2026 3:52:37 PM
Metadata
Fields
Template:
Permits_Development
DocName
PW-ENCUTIL-2603223
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2026
Location
West side of N Micke Grove Rd, North of Eight Mile Rd in Lodi
Type - Permit Process
Traffic control to replace pole & install new OH service/facilities
Address
3136 Boeing, Stockton, CA 95206
Application
Pacific Gas & Electric
Project #
730052
Type
Utility Encroachment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES: <br />1. The resurfacing requirements shall be in addition to County Standard <br />Drawing No. R-29. <br />2. If longitudinal cuts are required on a Local Road a Seal Coat can be used <br />for that half of the roadway containing the trench. Section 2-5.03B-1. <br />Area to be resurfaced with <br />one (1) inch Asphalt Concrete <br />overlay existing surface to be <br />planed, to accommodate overlay. <br />Section 2-5.02B-2. <br />i� <br />Area to be resurfaced with <br />one (1) inch Asphalt Concrete <br />overlay existing surface to be <br />planed to accommodate <br />overlay. Section 2-5.02B-2. <br />' — —' "aved Shoulder <br />3' minimum. <br />If <3', the remaining <br />pavement shall be removed <br />and replaced before <br />resurfacing. <br />Section 2-5.02B-1. <br />Area to be resurfaced with <br />one (1) inch Asphalt <br />Concrete overlay existing <br />surface to be planed to <br />accommodate overlay. <br />Section 2-5.02B-1. <br />• TRENCH CUTTING POLICY Approved by: <br />LONGITUDINAL CUTTING <br />OF COUNTY ROADWAYS No. Revision Description Date <br />A A I COUNTY OF S N JO QUN <br />DEPARTMENT OF PUBLIC WORKS <br />Working for YOU Date: DEC 2014 Std. Dwg. No. R'37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.