My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1403001 thru PS-1403500_ - PS-1403140
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2014
>
PS-1403001 thru PS-1403500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1403001 thru PS-1403500_ - PS-1403140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:30:26 PM
Creation date
12/31/2015 1:42:48 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1403140
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2014\PS-1403001 thru PS-1403500
Year2
2014
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
2 - BELLHOLES - PAVED AREA T-22
Owners
Parcel Address
SE CORNER OF WOODBRIDGE RD. AND HWY 99 FRONTAGE RD
Primary Parcel
Type (2)
PS-1403140
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 13. All trenches/bell holes shall be completely backfilled or shored and plated at the end of each <br /> workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br /> and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br /> submitted for prior approval by the County. <br /> 14. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 15. Temporary pavement shall be provided for all trench/bell hole areas within three days of <br /> pavement removal or by Friday of each week, whichever is more restrictive. <br /> 16. Roadway areas subject to pavement cuts shall receive a one (1) inch asphalt concrete overlay <br /> from the centerline (or lane line) to the edge of the travelled way. If the pavement is disturbed on <br /> both sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10-working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 17. No paving joints allowed within paved shoulder, contractor shall pave all the way to outer edge of <br /> paved shoulder. <br /> 18. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 19. Shoulder backing shall be backed with Class II Aggregate Base from edge of pavement a <br /> minimum of 4-inches thick by 4-feet wide. <br /> 20. School buses shall be passed through the work zone with minimal delays. <br /> 21. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br /> located as far to the outside edge as possible and if the location either meets AASHTO Clear <br /> Zone guidelines or is protected by an existing obstruction such as a tree or utility pole. Utility <br /> vaults shall be located a minimum of 4'-0" from edge of pavement. <br /> 22. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 23. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 24. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.