Laserfiche WebLink
-- -----;-- ------�-P-E-CTRL--P R O VI-�I-O loT-� - - ----_--- - . ------- -- - --- <br /> Winter Weather Utifity Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnishfull-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company-representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMINT: :Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER=TIGRYCONDITION: Ail trenches shall be filed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />