My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1403001 thru PS-1403500_ - PS-1403301
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2014
>
PS-1403001 thru PS-1403500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2014_PS-1403001 thru PS-1403500_ - PS-1403301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:31:06 PM
Creation date
12/31/2015 1:48:52 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1403301
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2014\PS-1403001 thru PS-1403500
Year2
2014
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
EXCAVATE TO REPAIR GAS LINE.
Owners
Parcel Address
S/S LEONARDINI 382' E/O HOMER
Primary Parcel
Type (2)
PS-1403301
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-------�-P-�CTAL--PRO-V.r�r01�S - -------_--- --;----------------._. . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall fumish.full-time supervision <br /> of all woi k to insure full compliance vvith,� the permit provisions. <br /> 2. START OF WORK- No work within the County right-of-way shall be started until the <br /> utility company-representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> 3. CL-VAN PANLENT: :Dirt and mud shall not be deposited on the pavement <br /> outside th'e area of wont, and if Madvertenty tracked onto the road travel way shall . <br /> be removed immediately. <br /> 4. DA"RESTOPATIO' N:- -Private driveways and road intersections shalt be restored <br /> daily <br /> 5. WFATHE-R,TXG$YOONDITION: All trenches shall be filfed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> C1. . <br /> i <br /> ' i <br />
The URL can be used to link to this page
Your browser does not support the video tag.