Laserfiche WebLink
-------�-P-�CTAL--PRO-V.r�r01�S - -------_--- --;----------------._. . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall fumish.full-time supervision <br /> of all woi k to insure full compliance vvith,� the permit provisions. <br /> 2. START OF WORK- No work within the County right-of-way shall be started until the <br /> utility company-representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> 3. CL-VAN PANLENT: :Dirt and mud shall not be deposited on the pavement <br /> outside th'e area of wont, and if Madvertenty tracked onto the road travel way shall . <br /> be removed immediately. <br /> 4. DA"RESTOPATIO' N:- -Private driveways and road intersections shalt be restored <br /> daily <br /> 5. WFATHE-R,TXG$YOONDITION: All trenches shall be filfed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> C1. . <br /> i <br /> ' i <br />