Laserfiche WebLink
Winter Weather Utility Work <br /> 1. SUPER` EION: The utility company(permittee) shall furnish.full-time supervision <br /> of all woi k to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company,representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. OIIFAN PA t 1 1NT: Dirtand mud shall not be deposited on the paverhent <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall . <br /> be removed immediately. <br /> 4. DAIGY:RFSTQ:A- TION:- -Private driveways and road intersections shall be restored <br /> daily - <br /> 5. W.IIiA:TB-R-T'IGHT'CONDITION: Ail trenches shall be ftlfed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />