Laserfiche WebLink
- ---- -P_F-CTA U-P R 4 VfS-r0N-S-- -- _-- ------ -- ------ -. . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORA: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. OI18AlaT P,kVEM2NT: :Dirt and mud shall not be deposited on the pavement <br /> outside ti-i'e area of work, acid if inadvertently tracked onto the road travel way shall . <br /> be removed immediately. <br /> 4. DAiGY:RFSTORAIIbN:- -Private driveways and road intersections shalt be restored <br /> daily - <br /> 5. WEATHER--` IGHT*CONDITION: All trenches shall be Tdied and'oompacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any. rain. <br />