Laserfiche WebLink
------�-P_.�CTA�--PRO-.�r�r01i�5._ ...----.---- -:-------------------- - <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to Insure full compliance With the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of waather conditions and has <br /> determined the work canoe accomplished under the provisions of the pan-nit. <br /> 3. CLVAIN PAVEMENT: D[rt and mud shalt not be deposited on the pavement <br /> outside th'e area of work, and if fnadvertentdy tracked onto tFie road travel way shall . <br /> be removed'immediately. <br /> 4. DAIGY•RESTOk&TION:• -Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER-TXGILT"CONDI'T`ION: Aft trenches shall be fflied and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> y <br /> • i <br /> S <br /> S <br />