Laserfiche WebLink
Winter Weather Utility Work <br /> 1 SUPERVBION: The utility company(permittee) shall furnish.full-time supervision r <br /> of all work to insure full compliance witi-, the permit provisions. <br /> 2. START OF WORT: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of wont, and if inadvertentdy tracked onto the road travel way shall . <br /> Ibe removed immediately. <br /> 4. DAMY:RESTOUTION: Private driveways and road intersections shall be restored <br /> daily - <br /> S. WEATHER- WRYCONDITION: Ail trenches shall be f[Iied and bompacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />