Laserfiche WebLink
Doc it: 2015-005614 <br /> 01/15/2015 10:36:29 RM <br /> Page; 1 of 6 Fee: $0 <br /> Kenneth W Blakemore <br /> San Joaquin County Recorders <br /> Pald By: COUNTY <br /> After recording,return to: <br /> County of San Joaquin <br /> c/o Director of Public Works <br /> 1810 E.Hazelton Avenue <br /> Stockton,California 95205 <br /> Attention:Public Services Division <br /> ROAD AND PIPELINE MAINTENANCE AGREEMENT <br /> This Road Maintenance Agreement(the"Obligation")is signed this lday <br /> of TANLA Bey ,2015 by Fondse Brothers,a California General Partnership(hereinafter <br /> referred to as"Obligors"). <br /> WHEREAS,the Obligors are owners of APN 245-210-06(hereinafter referred to as"the <br /> Land")and have made an application for an encroachment permit with the San Joaquin County <br /> Department of Public Works(hereinafter referred to as"County") for the installation of a <br /> private pipeline under a section of County owned road known as Wagner Road(hereinafter <br /> referred to as"Road",as defined below);and, <br /> WIIEREAS,this Obligation for repair and maintenance is a required condition for the <br /> approval of Encroachment Permit No.PS-1403494 with San Joaquin County for the installation <br /> of a private 6 inch irrigation pipeline(hereinafter referred to as"Pipeline"). <br /> Now,therefore,in consideration of the above,the Obligor hereto agrees as follows: <br /> 1. Description and Definition of"Road"and"Pipeline." Road is the section of road <br /> situated between APN 245-210-06 and APN 245-210-04 starting at the intersection of the <br /> Pipeline and the west side road right-of-way and continuing easterly parallel to the alignment of <br /> the Pipeline for a distance of seven and a half feet to each side of the pipeline measured <br /> perpendicularly from the centerline of the pipeline alignment(a total of fifteen feet). Pipeline is <br /> a private 6"pipeline. Both the Road and Pipeline are shown on the attached Exhibit"A"and <br /> incorporated herein by this reference. <br /> 2. Obligation.This Obligation for repair and maintenance is a required condition for <br /> the approval of Encroachment Permit No.PS-1403494 with San Joaquin County for the <br /> installation of the Pipeline and as consideration for such,Obligors shall be responsible for the <br /> maintenance of Pipeline and Road,including but not limited to the grading and resurfacing of the <br /> Road resulting from installation of Pipeline and/or related to the maintenance of Pipeline. <br /> Obligor shall obtain an encroachment permit prior to and for all work within road right-of-way. <br /> 3. Maintenance Standard. The minimum improvement standard(s)shall be as <br /> otherwise set forth per the current San Joaquin County Improvement Standards. <br /> 1 <br />