My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_Driveway Permits_PS-1500001 thru PS-1500500_ - PS-1500011
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
Driveway Permits
>
PS-1500001 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_Driveway Permits_PS-1500001 thru PS-1500500_ - PS-1500011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:31:35 PM
Creation date
12/31/2015 2:13:44 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500011
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\Driveway Permits\PS-1500001 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
GARY HARMELINK
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
W/S OF VAN ALLEN RD. 0.5 MILES S/O ALLEN RD.
Primary Parcel
Type (2)
PS-1500011
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'^- <br /> ' COUNTY OF SAN JOAQUIN <br /> 40' { DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Permit No: PS-1500011 <br /> STOCKTON,CALIFORNIA 95201 Start Date: 01/26/2015 <br /> i F Q Vie? (209)468-3000 Exp.Date: 01/26/2016 <br /> FAX#(209)468-9324 <br /> APN No: 24512030 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: GARY HARMELINK <br /> 12046 26 MILES RD. No pipe is required under and acif ross t'irty n h <br /> future <br /> OAKDALE,CA 95361 approach at this time, However,hatpipWill be <br /> It is determined by the County P P <br /> required at this location, all tobe the respOnsl- <br /> s pply needed <br /> Location: W/S OF VAN ALLEN RD.0.5 MILES S/O ALLEN RD. busty of the property owner <br /> PIDe per County requirements. <br /> In compliance with your request of 01/26/2015,and subject to all the terms,conditions and restrictions written below or printed as general or <br /> special provisions on any part of this form. <br /> Permission is hereby granted to construct shown on <br /> Permit Application No. PS-1500011 Quad: SE <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br /> vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br /> accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP)SEE STAMP inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE <br /> AND PIPE ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br /> clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es),include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(4 inch)NOT APPLICABLE <br /> minimum of compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 <br /> Aggregate Base specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement <br /> concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. Surface <br /> grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> Permittee shall call the Department of Public Works,Field Engineering Division(Permit Inspections)at(209)953-7421 at least <br /> forty-eight hours prior to beginning any work within the County right of way. After completion of the work permitted herein,all <br /> debris,lumber,barricades or any excess material shall be removed and the jobsite left in a neat workmanlike condition. The <br /> Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy of the residence, <br /> but not to exceed expiration date. <br /> MIKE SELLING,Deputy Director <br /> Department of Public Works <br /> Permit section <br /> FORMS: R-17,SS/WW <br />
The URL can be used to link to this page
Your browser does not support the video tag.