Laserfiche WebLink
SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company,(permittee) shall furnish full-time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORD: No work within the County right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the.area of work, <br /> and-if inadvertently tracked onto the road travel way shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br /> 5. WEATHER=TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br /> any rain. <br /> FAPERMITS COUNTER\general provisions\Winter Weather Provisions.docx <br />