Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> yr {' DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Permit No: PS-1501589 <br /> STOCKTON,CALIFORNIA 95201 Date Issued: 07/02/2015 <br /> ci F o (209)468-3001) Exp.Date: 07/01/2016 <br /> FAX#(209)468-9324 <br /> Project No: PWPI10005 <br /> APN No: 00317054 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: DELTA BUILDINGS <br /> 22769 N.BENDER RD. <br /> ACAMPO,CA 95220 <br /> Location: W/S OF BENDER RD.400'N/O TADDEI RD. <br /> In compliance with your request of 06/15/2015,and subject to all the terms,conditions and restrictions written below or printed as general or <br /> special provisions on any part of this form. <br /> Permission is hereby granted to construct One driveway w/o pipe shown on <br /> Permit Application No. PS-1501589 Quad:NW <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br /> vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br /> accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP) inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE AND PIPE <br /> ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear toe of <br /> approach fill or headwalls. <br /> The entire area of driveway approach(es),include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(6 inch)Six inch minimum of <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. Surface <br /> grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy of the residence, <br /> but not to exceed expiration date. <br /> Mike Selling,Deputy Director <br /> Department of Public Works <br /> NO pipe is required under atgd across drivewayy J <br /> apyroaeb at this time, However, if in the futurPermit sec 'on <br /> FORMS: ss/ww,R-17 it is determined by the County that pipe will be <br /> required at this location,it shall be the responsi- <br /> bility of the property owner to supi,iY needed <br /> pipe per County requirements. <br />