Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Permit No: PS-1501787 <br /> STOCKTON,CALIFORNIA 95201 Start Date: 07/30/2015 <br /> (209)468-3000 Exp.Date: 07/29/2016 <br /> FAX#(209)468-9324 <br /> APN No: 09750002 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: CLARK&SULLIVAN CONSTRUCTION <br /> 2024 OPPORTUNITY DRIVE SUITE 150 <br /> ROSEVILLE CA 95602 <br /> Location: S/S SWAIN RD@HARRISBURG PL <br /> In compliance with your request of 07/30/2015,and subject to all the terms,conditions and restrictions written below or printed as general or <br /> special provisions on any part of this form. <br /> Permission is hereby granted to construct Two driveway w/o pipe shown on <br /> Permit Application No. PS-1501787 Quad:LV <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br /> vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br /> accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP)SEE STAMP inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE <br /> AND PIPE ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br /> clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es),include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(N/A)NOT APPLICABLE <br /> minimum of compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 <br /> Aggregate Base specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement <br /> concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. Surface <br /> grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> Permittee shall call the Department of Public Works,Field Engineering Division(Permit Inspections)at(209)953-7421 at least <br /> forty-eight hours prior to beginning any work within the County right of way. After completion of the work permitted herein,all <br /> debris,lumber,barricades or any excess material shall be removed and the jobsite left in a neat workmanlike condition. The <br /> Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy of the residence, <br /> but not to exceed expiration date. <br /> No pipe is required under and across driveway <br /> approach A this time, However,if in the fuiure MIKE SELLING,Deputy Director <br /> it is determined oy the County that pipe :rill be Department of Public Works <br /> required at this location,it shall be the responsi- <br /> hility of the property owner to supply ;seeded <br /> pipe per County requirements. By 7. _— <br /> Permit section <br /> FORMS: R-17,SS/WW <br />