Laserfiche WebLink
f''= COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZI�LTON AVENUE Permit No: PS-1502950 <br /> �. 1•�f STOCKTON,CALIFOFNIA 95201 Start Date: 10/15/2015 <br /> • �_F_ou'' (209)468-3000 Exp.Date: 10/14/2016 <br /> FAX 4(209)468-9:324 <br /> APN No: 19331008 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: MANZO,ANTONIO JAVIER&LETICIA <br /> Location: n/s frisbee In e/o mckinly av <br /> In compliance with your request of 10/15/2015,and subject to all the terms,conditions and restrictions written below or printed as general or <br /> special provisions on any part of this form. <br /> Permission is hereby granted to construct One driveway w/o pipe:shown on <br /> Permit Application No.PS-1502950 Quad: SE <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br /> vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br /> accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP)SEE STAMP inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE <br /> AND PIPE ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to <br /> clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es),include flares for turning and/or paved frontage(s),from the edge of roadway pavement to <br /> right-of-way(front property)line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(4 inch)NOT APPLICABLE <br /> minimum of compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 <br /> Aggregate Base specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement <br /> concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. Surface <br /> grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> Permittee shall call the Department of Public Works,Field Engineering Division(Permit Inspections)at(209)953-7421 at least <br /> forty-eight hours prior to beginning any work within the County right of way. After completion of the work permitted herein,all <br /> debris,lumber,barricades or any excess material shall be removed and the jobsite left in a neat workmanlike condition. The <br /> Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy of the residence, <br /> but not to exceed expiration date. <br /> MIKE SELLING,Deputy Director <br /> Department of Public Works <br /> Permit section <br /> FORMS: I R-17,SS/WW <br />