Laserfiche WebLink
' 1 <br /> SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(pea ngitte ) shall furnish full:-time' supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. STAP`T OF WORK: No work within the'County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the-work can be <br /> ` accomplished under the provisions of the permit. <br /> 3. CLEAN PAVENMNT: Dirt and mud shall not be deposited*on the pavement outside the area of work, <br /> and if inadvertently tracked onto-the road travel way*shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways acid road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: All.trenches shall be.filled and compacted,.ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> FAMMITS COUNTEMgeneral provisions\Winter Weather Provisions.docx' <br />