Laserfiche WebLink
SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(perni.itke6) shall furnish fiall=time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OP WORD: No-work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the-work can be <br /> accomplished under the provisions of the-permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited'on the pavement outside the area of work, <br /> and if inadvertently tracked onto'the road trayel way'.Aall be.removed immediately. <br /> 4. DAILY RESTORATION:- Private drivevways.�and'road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: All 'trenches shall be filled and compacted,ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to-. <br /> any rain. <br /> F.\PERbvIlTS COUM•ER%general provisions%inter Weather Provisions.dom' ' <br />