Laserfiche WebLink
. - ----�-P-�cT��c--P R o vr�ro mss-- ..._----_--- - ----------- --------- - <br /> Winter Weather Utility Work <br /> 1. SUPERVE N. The utility company(permittee) shall furnish.full-time supervision <br /> of all work to iP..sure full compliance with the permit provisions. <br /> 2. START OF WORD: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of breather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> 3. CLE' P A CEMENT: 'Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if lhadvertently tracked onto t[ie road travel way shall . <br /> be removed immediately. <br /> 4. DA-M Y-RFSTOPA- TIO* N:- -Private dr(veways and road intersections shall be restored <br /> daily <br /> 5. WEATHER-TIGHT'EQNDITION: Ail trenches shall be flied and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> 1 <br /> 1 <br />