My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500069 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500069 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:31:44 PM
Creation date
12/31/2015 2:54:14 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500069 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
EMERGENCY WORK TO REPAIR GAS LINE.
Owners
Parcel Address
NW CORNER OF MADELINE AND BROUGHTON
Primary Parcel
Type (2)
PS-1500069
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish full-time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br /> and if inadvertently tracked onto the road travel way shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br /> any rain. <br /> F:\PERMITS COUNPER\general provisions\Winter Weather Provisions.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.