My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500104
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:31:46 PM
Creation date
12/31/2015 1:57:56 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500104
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTIC - SACRAMENTO
Contracts
CrossReference
PWP730052
Date Entered
1/14/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
THIE LOCATION IS NOT ON THE HWY.
Owners
Parcel Address
SE CORNER OF HARDING WAY AND NEWPORT AVE
Primary Parcel
Type (2)
PS-1500104
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- -----S-P-�cT�r--P u o vr�ra yrs._ ...----_--- - :----------- --------- . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall fumish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company-representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the pen-nit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DA•II.Y:RESTOhATION:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER- aHT'CONbMON: Ail trenches shall be ftl[ed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.