Laserfiche WebLink
- -----S-P_.E-CTAL--P R O`�I-�r0 N-�-- --------_--- --------------------. . <br /> Winter Weather Utiiity Work <br /> 1. SUPERVISION: The utility company (permittee) shall famish.full-time supervision <br /> of all work to in-.sure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLEAN PAVENMNT: Dirtand mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAM.Y:RESTORATION:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEAT-HER-TIGHT'EONDITION: All trenches shall be filfed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> Cl. . <br />