GENERAL PROVISIONS
<br /> **rrrrYY��rn rw rim n r r n mrnY.r nv r m rr mr7�r.A r+r- nm.-.r rl�TT 1'MES A nm plT rlr r*TL'C�rXYTI'TM,,T nr%T MT rxr RO A TD RIC-�PS_(1t_Cxr A v
<br /> ✓V LiLUV11V lJ 11`IJ L i-LLLill LI-INT
<br /> %-Y SUUJ U1l1 L"11..P..J1LC lJ 1.1 Urcr.� H1YlL rlr C.L11V L'J YY 1111111`1 VV VL\1 L L\vi u/iuvi •Y Lll
<br /> ?UBLIC CONVENIENCE AND SAFETY:
<br /> A. Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment or other barrier permitted for any
<br /> prolonged period of time,the Permittee shall notify the known users of the respective thoroughfare(sy involved,and shall provide access for vehicular and
<br /> pedestrian traffic to and from the road.
<br /> 1 Unless otherwise permitted,all work shall be conducted in such a manner that no less than one lane of the existing County road traveled way will be
<br /> . o
<br /> maintained open to public traffic during working hours is a smooth and safe riding condition(s) Two lanes shall be open after working hours.
<br /> 2. in cases where road closure is permitted,the permission to close the road will be granted under the condition that the Permittee notify the following
<br /> persons and/or agencies of the time,the period of closure,and the detour route at least twenty-four(24)hours prior to said road closure.
<br /> a The County of San Joaquin Public Works Department d The local fire district
<br /> b.The County of San Joaquin Sheriff s Office e.The local school district
<br /> c.The local postal service - f.The local residents involved
<br /> B. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable flagmen as may be necessary shall be.provided
<br /> by the Permittee and stationed in advance of work to warn and direct traffic.
<br /> C. Lights,signs and barricades shall be furnished,erected and maintained by the Permittee for the adequate warning and convenience of the public,with
<br /> particular attention to be taken in this regard after dark
<br /> D. Any excess dirt and/or debris which might be a hazard to either automobile or pedestrian traffic,uncontrollable by lights,signs and barricades,shall be
<br /> reriioved from the job site daily.
<br /> STRUCTURES:
<br /> k Walls of structures shall be such quality and strength that they will resist all pressures and will not crack or be deformed.in such a way as to create a
<br /> urzard or maintenance problem at any time.Therefore,the minimum structural requirements for concrete pipe placed under County road rights-of-way shall
<br /> :6nf6rm to-the following American Association of State Highway and Transportation Officials(AASHTO)designations.
<br /> 1.For concrete pipe up to and including thirty-three inches(33")inside diameter,extra strength concrete pipe conforming to AASHTO-Designation M 170M.
<br /> 2.For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO designation M 170M Class UL
<br /> 3:Plastic pipe conforming to AASHTO Designation M 294.
<br /> I--All concrete pipe joints within County road rights-of-way shall be sealed against leakage and/or infiltration with rubber gasket in conformance with
<br /> ectioa:65-1'.06 of the California Standard Specifications,or with other methods as may permitted under the Special Provisions.
<br /> Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shall not be installed within the County road
<br /> ights-of-way unless.specifically so stated in the Special Provisions,and only under the conditions as provided.
<br /> D. All structures to be buried within the County road rights-of-way shall be set at such elevations as to allow minimum coverage of thirty inches(30")to
<br /> ie centerline of the roadways and twelve inches(12")at the bottoms of borrow ditches each side of the roadways.The depths of structures shall be established
<br /> clow a flat plane extending across the rights-of-way,no part of which shall extend above the elevations stated above;manholes,lampholes,valves.etc.not
<br /> icluded Future surface.elevations shall be.anticipated.as nearly as possible and structure elevations shall be established.•forfuttim adjustmentaccotdingiy.
<br /> H. The County hereby reserves the right to specify in the Special Provisions the gage and surface treatment of any galvagized-cornigated metal pipe that is to
<br /> ie installed
<br /> F. All longitudinal utility facilities are to be established(and dimcnsioued on sketches)from surveyed centerlineof road-right-of-way,not from fight-of-way
<br /> )order)lines.
<br /> REPAIRS OF THE COUNTY RIGHT-OF-WAY:
<br /> All excavations shall be backfilled and compacted immediately after work therein has been completed.
<br /> Trenches shall not be left open farther than 300 feet in advance of pipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted
<br /> y the Engineer.
<br /> Unless otherwise permitted under the Special Provisions,backfin shall be placed and mechanically compacted in such a manner that the relative
<br /> impaction throughout the entire fill within the County road right-of-way shall conform to the percentages of compaction as shown on the Trench Detail
<br /> . Backfill material shall be placed in horizontal uniform layers not to exceed in thickness,before compaction,0.67 foot in the bedding region,one foot
<br /> here 90%compaction is required,and two feet where 80%compaction is required .
<br /> No portion of the excavation(s)shall be compacted by ponding or-jetting unless a maintenance bond is provided-
<br /> Gravel
<br /> rovidedGravel backfill material shall be utilized only where specifically so stated on the face of the permit It shall be compacted by means of a high-frequeacy
<br /> ternal.vibrator,the compactor to be a size and type approved by the Engineer..Points of compaction shall be not greater than 18"centers and to the full
<br /> :pth bf the lift
<br /> 'r. All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head wails,road signs,trees,shrubbery,and/or other permanent road facilities
<br /> ipaired by or as a result of construction operations at the construction site(s),or at other ground(s)occupied by materials and/or equipment,shall be
<br /> stored immediately upon backfilling of the excavation to the original grades and cross sections,and to a condition as good as,or better than existing prior
<br /> construction.
<br /> All surfacing materials of roadways and driveway approaches cut or damaged by or as a result of construction operations,shall be replaced within
<br /> NE WEEK following the backfilling of excavation,weather permitting,with compacted layers.of surfacing materials at least as thick as the existing,and no
<br /> ss than two inches(2")of asphalt concrete over six inches(6")of aggregate base,both as.specified below.
<br /> 1.Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for Type`B"one-half(1/2")maximum
<br /> aggregate,coarse or medium gradation,as specified in Section 39 of the California Standard Specifications.The bituminous binder to be mixed with
<br /> mineral aggregate shall be.paving asphalt having(Grade PG 64-10),unless otherwise directed by the Engineer.Placement of asphalt
<br /> concrete surfacing shall conform to the applicable provisions of Section 39 of the California Standard Specifications.
<br /> 2.Aggregate Base:Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3/4")maximum size aggregate
<br /> Class 2 Aggregate Base specified in Section 26 of the California Standard Specifications
<br /> Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall be removed and the
<br /> Instruction areas left in a neat and presentable condition(s).
<br /> 1.If necessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust
<br /> 2.Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer.,.
<br /> Upon request by the County,any settlement,sagging of surface,or cracking of pavement shall be repaired immediately by and at the sole expense of,
<br /> e Permittee for a period of one year following acceptance of the work.
<br />
|