Laserfiche WebLink
------�-P-�cTAr--P R o�r�ro�s-- ----_--- -- , -------- --------- . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of afl work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canoe accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if lhadvertently tracked onto the road travel way shall <br /> be removed immediately, <br /> 4. DAII.Y.RESTOPATION:- Private driveways and road intersections shall be restored <br /> daily <br /> 5. WEATHER-MUT'CONDITION: All trenches shall be fd[ed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />