My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500164
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:31:57 PM
Creation date
12/31/2015 2:10:29 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500164
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
PWP730052
Date Entered
1/21/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
S/S DOUG MITCHELL DR 20' W/O DAVIS RD
Primary Parcel
Type (2)
PS-1500164
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
------ -P.E-CTR L--P R O Vr5_r0 N^S._ ...-- -- - :--- -- --- --- - <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can--be accomplished under the provisions of the pen-nit. <br /> I CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if ihadverten-dy tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY,RESTORATION:- Private driveways and road intersections shall be restored <br /> daily <br /> S. WEATHER=TMH'CONDITION: Ail trenches shall be ftifed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.