Laserfiche WebLink
------ -P.E-CTR L--P R O Vr5_r0 N^S._ ...-- -- - :--- -- --- --- - <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work can--be accomplished under the provisions of the pen-nit. <br /> I CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if ihadverten-dy tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY,RESTORATION:- Private driveways and road intersections shall be restored <br /> daily <br /> S. WEATHER=TMH'CONDITION: Ail trenches shall be ftifed and'compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />