Laserfiche WebLink
------ -P E_CTAT--P R O V fSTO N_8'_ <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company-representative has made an evaluation of weather conditions and has <br /> determined the work can be accomplished under the provisions of th'e permit. <br /> 3. QLtAldt PAVEMENT: .-Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel-way shall <br /> be removed immediately. <br /> 4. DAA Y RESTORATION: Private driveways and road Intersections shall be restored <br /> daily <br /> 5. WEATHER-TIGHT'r NDITION: Ail trenches shall be f lfed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> i <br />