Laserfiche WebLink
------�-P-OCTA L--PRO-YI-�r0 N^S-- ------,--- -------------------- - <br /> Winter Weather U fifty Work <br /> 1. SUPERVISION: The utility company (permittee) shall furrrsh.full-time supervision <br /> of all work to insure full compliance with the permit ptovfslons. <br /> 2. START OF WORK No work within the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> de'La=lned the work can-.be accomplished under the provisions of tfie permit. <br /> 3. CLLAN PAVE IENT: :Dirt and mud ,§half not be deposited on the pavement <br /> out,§lde the area of work, and 'if inadvertentfy tracked onto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY,-RESTORATION: Private driveways and road intersections shall be restored <br /> dally <br /> 5_ WEATHER-TIQHT OONDI'I`ION: Ail trenches shall be ffffed and compacted, <br /> ditches an other dralnage facilities regraded and opened, and the entire work area <br /> restored to weafher-tight condition prior to any rain. <br />