My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500205
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500205
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:32:06 PM
Creation date
12/31/2015 2:13:18 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500205
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
PWP730052
Date Entered
1/23/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
EMERGENCY WORK TO REPAIR GAS LINE.
Owners
Parcel Address
E/S MARGARET AVE 58' S/O EUCLID AVE
Primary Parcel
Type (2)
PS-1500205
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-----�-P-�t�TAL--PRO-�r�f01i'-�-- -----_--- --:---------- -------. . <br /> Winter Weather UtRity Work <br /> 1. SUPER�SION: The utility company (permittee)shall furnish.full-time supervision <br /> of all work to in-.sure full compliance sMth the permit provisions. <br /> 2. START OF WORK: No work within the County right-of-way shall be started until the <br /> utility company represen tatfve has made an evaluation of weather conditions and has <br /> determined the work can.be accomplished under the provisions of the permit. <br /> 3. CLVAN PAVENItNT: :Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if inadvertently tracked onto the road travel-way shall <br /> be removed immediately. <br /> 4. DAIG'Y:RESTOfiATION: Private driveways and road intersections shalt be restored <br /> daily <br /> S. WTHA-TEER=TIGHT-CONDITION: Ail trenches shall be fdfed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition pHor to any rain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.