Laserfiche WebLink
DEPART MEN 1 OF PUBLIC WORKS <br /> F. For trenchless excavations greater than three feet in depth of cover over the utility <br /> facility, and not requiring a signincant surface incision greater than industry bore <br /> pit standards. <br /> Exceptions must be requested and submitted in writing to the Depar=tment. Payment 0"a non- <br /> refundable prodessing fee-is also required. Exceptions will be reviewed using the Department's <br /> Action Approval process, which requires the recommendation of a Deputy Director. <br /> , <br /> 1SUSRAT1PRDrEDLTP,Z-S RIDDRA,'TND cHM'GES a-12-tz..DDc PAGE 3 OF 3 REVISED 09-1-2-12 <br /> REVi.SION NO. 2 <br />