My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500230
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:32:10 PM
Creation date
12/31/2015 2:15:09 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500230
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
WOODBRIDGE IRRIGATION DISTRICT
Contracts
CrossReference
PWP7110005
Date Entered
1/28/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
WOODBRIDGE RD. 40' E/O LUCAS RD. AT WID CANAL
Primary Parcel
Type (2)
PS-1500230
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F' ?-15(i'S23C1 Ja,vidiy 28, 2016 <br /> SPECIAL CONDITIONS FOR <br /> WOODBRIDGE ROAD —WID CROSSING <br /> ENCROACHMENT PERMIT <br /> 1. See attached "Minutes" of January 13, 2015 meeting between San Joaquin County and <br /> Woodbridge Irrigation District for each entities responsibilities. <br /> 2. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 3. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> 4. Residents and businesses shall be notified in writing, as approved by the County, 48 hours in <br /> advance of any impacts to their access. <br /> 5. Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br /> least 48 hours in advance. <br /> 6. All pavement markings destroyed or obliterated must be replaced in kind by the San Joaquin <br /> County. Typical pavement markings include, but not limited to, lane lines, centerlines, stop and <br /> stop ahead legends, limit lines, raised pavement markers and miscellaneous delineators. <br /> 7. The Permittee is responsible for the preservation of survey monuments located within the area of <br /> work herein permitted. Prior to the start of construction, survey monuments that potentially may <br /> be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br /> filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br /> construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br /> with the County Surveyor. (Land Surveyors' Act Section 8771) <br /> 8. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by Woodbridge Irrigation District (WID). WID shall be <br /> responsible for any and all costs associated with the removal, relocation and/or adjustment of <br /> these facilities as determined by the County at WID's expense. (Streets and Highways Code <br /> 1463) <br /> 9. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit. <br /> 10. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 11. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.