My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500230
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1500000 thru PS-1500500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1500000 thru PS-1500500_ - PS-1500230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:32:10 PM
Creation date
12/31/2015 2:15:09 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1500230
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1500000 thru PS-1500500
Year2
2015
Supplemental fields
Applicant
WOODBRIDGE IRRIGATION DISTRICT
Contracts
CrossReference
PWP7110005
Date Entered
1/28/2015
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
WOODBRIDGE RD. 40' E/O LUCAS RD. AT WID CANAL
Primary Parcel
Type (2)
PS-1500230
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minutes of January 13, 2015 Meeting: <br /> The County and WID met to discuss the irrigation crossing failure on Woodbridge Road just west of the <br /> Windwood Subdivision. The three 36" CMP's are damaged due to metal corrosion beyond repair and <br /> will need to be replaced.The replacement will need to occur before March to eliminate conflict with the <br /> irrigation season.The County and WID have agreed to the following; <br /> - The replacement pipes will be Class IV Concrete pipe <br /> - The roadway will remain open in both directions during construction <br /> - The headwalls will not be replaced <br /> - The replacement will be performed in 2 weeks <br /> - The work will occur in two stages <br /> The County has agreed to perform the following; <br /> - Provide a traffic control plan and provide traffic control in advance of the work area. <br /> - Provide WID with a no cost encroachment permit <br /> - Place and provide final paving of the crossing during each stage of the work <br /> - Pay% of the pipe cost estimated to be$5,736.00 <br /> WID has agree to the following; <br /> - Provide all labor equipment and materials to remove and replace the existing culverts, with <br /> the exception of final paving <br /> - Provide temporary traffic control at the work site. ( K-rail,temporary delineation, flagmen <br /> etc.) <br /> - Pay%of the pipe cost estimated to be $5,736.00 <br /> - Complete all work and bring the roadbed to compacted final subgrade at each stage <br /> The County would need to pay the vendor directly for the County's share of the replacement culverts to <br /> avoid needing Board Approval.An encroachment permit will be required and the actual work must be <br /> coordinated with the County's Road Maintenance Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.