Laserfiche WebLink
Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company (permittee) shall furnish.full-time supervision <br /> of all work to insure full compliance M-±-, the permit provisions. <br /> 2. START OF WORIZ: No work vwT;thin the County right-of-way shall be started until the <br /> utility company representative has made an evaluation of weather conditions and has <br /> determined the work canbe accomplished under the provisions of the permit. <br /> 3. OMAN P 4VEMENT: :Dirt and mud shall not be deposited on the pavement <br /> outside the area of worm and if inadverterntly tracked onto the road travel-way shall <br /> be removed immediately. <br /> 4. DAILY.RESTORATION:- Private driveways and road lntersections shall be restored <br /> daily <br /> 5_ WEATHER-TIGHT'EONIDITION: Alf trenches sha11 be Cfed and compacted, <br /> ditches an other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br /> 1 <br /> ,`l <br />